Concreting in Dandenong

IMG_1228

A commercial job, completed by Mills Construction Group was to lay the concrete floor for a recently built factory, the factory floor was approximately 5000 square meters.

The job included the leveling of the ground, building of form work, cutting rio to size, laying the rio and the concrete pour itself and leveling of the concrete.

Leave a Reply